Simplified methods on building construction (for fresh engineers). Part 2, Organizing and estimating basic planning and scheduling monitoring and controlling / Virgilio N. Porte.
By: Porte, Virgilio N
.
Material type: 



Current location | Collection | Call number | Copy number | Status | Notes | Date due | Item holds |
---|---|---|---|---|---|---|---|
University of Santo Tomas-Legazpi Main Library Filipiniana | Filipiniana | Fil. TH 438.4 .P67 2021 c-1 (Browse shelf) | 1 | Available | JB | ||
University of Santo Tomas-Legazpi Main Library Filipiniana | Filipiniana | Fil. TH 438.4 .P67 2021 c-2 (Browse shelf) | 2 | Available | JB |
Total holds: 0
Browsing University of Santo Tomas-Legazpi Main Library Shelves , Shelving location: Filipiniana , Collection code: Filipiniana Close shelf browser
![]() |
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
Fil. RT 62 .U33 2024 c-2 Comprehensive nursing licensure review book. Volume 2 : | Fil. T 58.5 .A23 2023 Living in the information technology era / | Fil. TH 438.4 .P67 2021 c-1 Simplified methods on building construction (for fresh engineers). Part 2, Organizing and estimating basic planning and scheduling monitoring and controlling / | Fil. TH 438.4 .P67 2021 c-2 Simplified methods on building construction (for fresh engineers). Part 2, Organizing and estimating basic planning and scheduling monitoring and controlling / | Fil. TH 145 .P67 2021 Simplified methods on building construction (for fresh engineers) : | Fil. TH 145 .P67 2022 C-1 Simplified OJT (On-Job-Training) on building construction : | Fil. TH 145 .P67 2022 c-2 Simplified OJT (On-Job-Training) on building construction : |
There are no comments for this item.