000 | 00850nam a22002177a 4500 | ||
---|---|---|---|
005 | 20250326151745.0 | ||
008 | 250326b xxu||||| |||| 00| 0 eng d | ||
020 | _a9786218035447 | ||
040 |
_cOSt _erda |
||
050 |
_aTH438.4 _b.P67 2021 |
||
082 |
_a690.068/4 _223 |
||
100 | 1 |
_914706 _aPorte, Virgilio N., |
|
245 | 1 |
_aSimplified methods on building construction (for fresh engineers). Part 2, Organizing and estimating basic planning and scheduling monitoring and controlling / _cVirgilio N. Porte. |
|
260 | 1 |
_aQuezon City, Metro Manila : _bLorimar Publishing, Inc., _c[2021] |
|
260 | 4 | _c©2021 | |
300 |
_aviii, 240 pages : _billustrations (some color) ; _c28 cm |
||
650 | 0 |
_914707 _aBuilding _xSuperintendence. |
|
650 | 0 |
_912979 _aBuilding _xDesign and construction. |
|
650 | 0 |
_914708 _aProduction scheduling. |
|
942 |
_2lcc _cBKFIL |
||
999 |
_c31020 _d31020 |